Building an above ground pool deck question? - pool decks

We install an above ground pool. If we do the pool in the first and bridges, or build around him and install the latest cover pool? Should we put concrete under the pool?

4 comments:

NoPain00 said...

In any case, the first pool. You get everything, the site for construction of the wall and the coating, etc. must also be adapted accordingly, it is often easier to place, and cut out the pool cover for the 'Fit accurately and not vice versa.

Since the concrete under the pool, it is not necessary, but perhaps a good idea. For most installations, all you need to do is on the lower level and the sand is set to a uniform surface. Since the weight is evenly distributed, there is no pressure to be maintained.

However, if the ground is very soft, or swamp, then a concrete slab is a good idea for the consortium does not change over time.

Incidetnally absolutely necessary for the concrete foundation to the roof.

DIY Doc said...

Hello,

After numerous bridges installed in my time, some adjustments in the pool of fact may be questionable, but .....

In any method you choose to install a bridge, without knowing in the composition of the whole earth is a very important issue to stabilize the soil, the size of the pool or stay far enough away from him with sticks and 4 holes x 4 facilities, not to disturb the stability of the pool. Nearlt the facts are not to be any problem to fix.

My opinion is that this area if the pool is full or not, if you use the deck, but many people start with a pool and only access to the stairs.

In my opinion, included, is the fact that water weighs 8.5 pounds per gallon. Without knowing the capacity of the pools, you can do the math. Even when 10,000 gallons. For example, the weight corresponds to the soil around £ 85,000. Disturbances close to the edge of the pool could be a problem.

Above ground pools are the best settings set graded sand beds.

Where StevenIf
Also known as: Doctor Deck
Just my 2 "sense"

sensible... said...

Establishment of the first tank. When the first bridge built, will end up struggling with the installation of the pool. I would not put concrete underneath. He will eat the peel or rub. A small tip. Install a drain on the floor when the creation of the pool. This makes things much easier later. Under the sand, I used the blanket material to block the growth of vegetation. I reached a foot above the sides of the pool round, then the material presented covered with stone. Worse than the search for a strong growth of weeds on the bottom line of the pool alone.

lilylady... said...

I think it would be easier to share in the first basin and building the deck around - only to build the bridge from the center outwards, so that you have never been to the pool to do so. When the first cover, and even a measurement error, the pool does not comply and go crazy.
In particular, I have no idea.